
| CBCWA Pipeline Project Photo Page General Information Have a Question Contact Us Home | ![]()
At the bottom of the shaft is the tunnel that is being bored to cross under the Fox River. The tunnel boring machine (TBM) and the conveyor belt -- used to remove rock chipped away by the bore machine are deep inside the tunnel. Track is installed behind the TBM for hopper cars to use as they remove the rock chips. Lights installed along the tunnel wall aid the crews as they work. |
All subject matter contained within the Web site is ©2007 Central Brown County Water Authority. All rights reserved.
This site is designed and maintained by Epic Business Solutions.