
| CBCWA Pipeline Project Photo Page General Information Have a Question Contact Us Home | ![]()
This is the first section of 36-inch pipe placed in the west shaft of the Fox River crossing. The pulling head has been attached to this pipe. The chain at the forefront of the photo is connected to the pulling head at one end and to a cable used to pull the pipe through the tunnel at the other end. |
All subject matter contained within the Web site is ©2007 Central Brown County Water Authority. All rights reserved.
This site is designed and maintained by Epic Business Solutions.